Zoeken
mv Nordana Star - Building Progress
- Symphony Shipping
- 15 apr 2015
- 1 minuten om te lezen



The fore-ship with superstructure and the hold sections are placed on the slipway. The aft-ship is being built and erected in the production hall. The main engine will be placed in the engine room soon.