15 apr 2015mv Nordana Star - Building Progress The fore-ship with superstructure and the hold sections are placed on the slipway. The aft-ship is being built and erected in the production hall. The main engine will be placed in the engine room soon.
The fore-ship with superstructure and the hold sections are placed on the slipway. The aft-ship is being built and erected in the production hall. The main engine will be placed in the engine room soon.